Miami parks / Miami River
José Martí Park is a riverfront recreation and community gathering place in Miami, on the eastern side of Little Havana. Its riverwalk, sports facilities and neighborhood programs connect the park with daily life along the Miami River. Later planning combined community consultation with a phased response to tidal flooding.[1][2]
Recreation beside the river§
John Charles Robbins’s November 2017 account places the park beside the Miami River, beneath the elevated Interstate 95 corridor. He describes a public riverwalk along the property, together with swimming, baseball, basketball, a playground and a gymnasium. Classes and seasonal programs included English-language learning, computing, and arts and crafts for older residents.[1]
The same account describes different waterfront conditions within the park: an elevated seawall at the southern end and an unprotected northern stretch where tidal flooding reached the riverwalk and green space. Flooding and access were therefore part of the planning problem alongside the existing recreational uses. In 2017, consulting support for a new general plan was being considered, rather than a completed reconstruction.[1]
Residents and the redesign§
Van Alen Institute’s November 2019 announcement identifies Curtis + Rogers Design Studio as the selected design team for the Keeping Current project. It describes the park as a 13-acre facility near Downtown Miami, serving the surrounding Little Havana community.[2]
The institute recounts a consultation process begun in spring 2018 with residents and business owners. An outreach team surveyed more than 200 community members to inform the design brief, organized an on-site festival to introduce the solicitation, and hosted a November 16 meet-and-greet with the selected designers. These were completed engagement activities preceding construction, bringing neighborhood experience into the design process.[2]
A phased waterfront project§
The City’s project account records further community meetings in February and September 2020. The latter presented the project in English and Spanish. Interactive areas at the February meeting gathered views on the seawall, kayak launch and landscaping.[3]
A later update reports that Phase I construction began in September 2026, with the northern area closed for work and an anticipated completion in August 2028. Its proposed elements include a new seawall, drainage improvements, living-shoreline features, a kayak ramp and an improved riverwalk. The City describes southern-area work as a subsequent phase. The stated completion date remains a forecast, distinct from the reported construction start.[3]
Sources & references
- Jose Marti Park getting aid from New York nonprofit — November 14, 2017 Miami Today / John Charles Robbins. Retrieved . ↑1↑2↑3
- Curtis + Rogers Design Studio to Redesign Miami’s José Martí Park — November 18, 2019 Van Alen Institute. Retrieved . ↑1↑2↑3
- Jose Marti Park Adaptive Redesign — 2026 project update City of Miami / Office of Capital Improvements. Retrieved . ↑1↑2↑3